Due to the hot weather and dry climate, renovation projects often give people a feeling of ease and ease of construction. However, if there is any carelessness, it is prone to deformation of wood and lifting of the floor. Wall cracks, dry paint, fog, and other issues. Therefore, in the summer construction, the following situations must be especially noted:
To give the tiles water
In summer, because the material is drier than normal, the time required for the treatment of the swelled water should be extended for the tiles, tiles and other materials that need to be treated with swelled water, so that they are fully close to saturation. In this way, it will not appear that when the adhesive is bonded to the cement due to the water absorption, the emptying and detachment occur.
When processing materials like gypsum, the setting time should be strictly controlled. Because in the high-temperature dry weather, the molding of the gypsum is more difficult to control, so the setting time should be strictly controlled so that it can reach the standard compressive tensile strength and coefficient.
Wall treatment to be clear
When dealing with interior wall paints, due to the hot weather in summer, special attention should be paid to its stability, bonding strength and initial dry crack resistance. The approach taken at this time is to carefully observe the details and make detailed time recordings before making comparisons.
Note the size of the thermal expansion and contraction
In the measurement and installation of plastic doors and windows, sliding doors, pay attention to thermal expansion and contraction in the size arrangement. Because steel is a material that is greatly affected by temperature, if it is too compact in size, it will have gaps and deformations due to lower temperatures in winter, so there should be a slight surplus in size.
Flooring is compact
When paving the floor, the gap should be arranged more closely than before to avoid the gap becoming larger when the temperature decreases and affecting the appearance. Floor and wall joints can be used to form transitions on the floor, this way, not only deal with the wall and floor gap is too large drawbacks, but also played a beautiful role.
In addition, the home improvement often encounters the problem of latex paint that is slow to dry and will smell mildew in hot and humid weather. In this regard, the general approach of the decoration company is to open the air-conditioning dehumidifiers and draw away the moisture from the air; the furniture cabinet door is not closed and the ventilation is maintained. After the renovation, you will also encounter various problems that cannot spread out and affect people's health. The expert's suggestion is to put more green plants after the renovation, to use light and the role of removing odors, or put two or three lemons or oranges and bananas in the room, which can achieve fast deodorizing effect.
As for the cause of blackening caused by the balcony retaining wall, the main reason is that the outer wall of the rainy day is damp and the moisture slowly penetrates from outside the wall. After the protective paint on the wall is sealed, the moisture cannot be distributed to the outside, resulting in blackening. The paint film is curled up, so on the balcony as a protective wall, we must first do back surface treatment.
DELL floor nature floor paint cement home window latex paint decoration decoration decoration company okay floor tile door exterior wall tile ceramic tile floor tile balcony tile decoration home
Hex Nut,Hexagonal Nut,Heavy Hex Nut,Hex Flange Nut
Hebei Qianmu Fastener Manufacturing Co., Ltd , https://www.qmjgjfasteners.com